Folding, sliding doors.
Collection BETA model
DOOR LEAF CONSTRUCTION
Rebated door leaf
The complete set comprises:
- guide bar system (extra charge to set)
- two-element door leaf
- Porta SYSTEM door frame (modified)
The core of the door leaf is a honeycomb insert or perforated chipboard in a frame of laminated wood reinforced with an internal plywood muntin (an option at an extra charge)1.ALPHA is a two-element asymmetrical door with a traditional lock in the leaf and a lock striker in the door frame.The leaves are covered with natural veneer and coated with matte varnish.
ACCESSORIES IN THE PRICE OF DOOR
- Guide bar system
- Sealing strip
- Three silver concealed hinges
- Lock: regular key, bathroom lock or adapted for door lock cylinder
- Lock striker
DOOR FRAMES
Modified Porta SYSTEM door frame, width range from B to K
NOTES
- Technical Approval AT-15-7458/2012, ITB Warszawa.
1The doors which are covered with veneer from natural wood have a perforatedchipboard as standard..
Select model
range B
range C
range D
range E
range F
range G
range H
range I
range J
range K
Download all CAD files
Similar products - Folding, sliding doors
Realisation time - Live Update
Collection BETA - model
TERM OF PLACING ORDER
If you place an order at Dealer's Sales Outlet or cooperating Authorized Outlet Point and this order will be sent to Porta to the end of a day:
TIME OF ORDER REALISATION INCLUDING TRUCKING TO DEALER days *
Porta will deliver ordered doors to dealer's warehause till end of a day:
* ATTENTION
Realisation time only for doors in a set with Porta System and with metal frame.
Deadline can be not reached in case of serious breakdown in factory.
Deadline can be not reached in case of breakdown during transport.
Deadline doesn't include the transport between dealer and cooperating Sales Outlet Point; average time 2-4 days.
Order realization time placed in different moment, can be changed.
Realisation time only for doors in a set with Porta System and with metal frame.
Deadline can be not reached in case of serious breakdown in factory.
Deadline can be not reached in case of breakdown during transport.
Deadline doesn't include the transport between dealer and cooperating Sales Outlet Point; average time 2-4 days.
Order realization time placed in different moment, can be changed.