Interior doors.
Collection Porta ROYAL model Solid
Premium UV paint ?
DOOR LEAF CONSTRUCTION
Stabilizing filling two-sided covered with pressed HDF board.
ACCESSORIES IN THE PRICE OF DOOR LEAF
- Two pintle hinges as standard, PRIME package is also available, see Supplementary Costs
- Lock: regular key, bathroom lock or adapted for door lock cylinder
- Glass panel pattern: ‘chinchilla’
- Round flush pull (for sliding doors)1
DOOR FRAMES
Recommended rebated door frames:
- Porta SYSTEM with Portadecor finishing
- MINIMAX with Portadecor finishing
NOTES
- Technical Approval AT-15-3691/2012, ITB Warszawa.
- Possibility to freely select the sizes of door leaves for double doors.
- We recommend Royal handle with escutcheon plate.
- Handle for the large light model with a plate width no larger than 42 mm.
- Double doors not available with magnetic lock.
1 Does not apply to large light model (only finger front handle)
Download all CAD files
Similar products - Interior doors
Realisation time - Live Update
Collection Porta ROYAL - model Solid
TERM OF PLACING ORDER
If you place an order at Dealer's Sales Outlet or cooperating Authorized Outlet Point and this order will be sent to Porta to the end of a day:
TIME OF ORDER REALISATION INCLUDING TRUCKING TO DEALER days *
Porta will deliver ordered doors to dealer's warehause till end of a day:
* ATTENTION
Realisation time only for doors in a set with Porta System and with metal frame.
Deadline can be not reached in case of serious breakdown in factory.
Deadline can be not reached in case of breakdown during transport.
Deadline doesn't include the transport between dealer and cooperating Sales Outlet Point; average time 2-4 days.
Order realization time placed in different moment, can be changed.
Realisation time only for doors in a set with Porta System and with metal frame.
Deadline can be not reached in case of serious breakdown in factory.
Deadline can be not reached in case of breakdown during transport.
Deadline doesn't include the transport between dealer and cooperating Sales Outlet Point; average time 2-4 days.
Order realization time placed in different moment, can be changed.